Free checklist
The CDM 2015 duty holder checklist
Six things to settle before a construction phase starts: who holds which duty, whether the job is notifiable to HSE, and which documents you actually need. Written for small and medium UK contractors who do not have a full-time health and safety team.
Where ScopeKit fits
ScopeKit produces the paperwork this checklist asks for: F10 notifications, construction phase plans, RAMS, permits to work, and a health and safety file assembled as the job runs rather than reconstructed at the end. It does not make a project compliant, which is down to the duty holders, but it does mean the evidence exists when someone asks for it. Book a 15-minute demo if you want to see it on one of your own jobs.