Team scheduling

Construction Team Scheduling That Actually Works

No more WhatsApp groups, phone calls at 6am, and spreadsheets that are out of date by lunchtime. ScopeKit gives you drag-and-drop scheduling that checks qualifications as you assign, so a gap shows up before anyone is on site.

15-minute walkthrough. No credit card required.

The ScopeKit scheduling timeline for a garage conversion, showing each job against the baseline, the links between them, today’s line and the days each job has slipped

Scheduling built for construction

Construction scheduling is not like office scheduling. People are on different sites, qualifications matter, and things change by the hour. ScopeKit handles all of it.

Weather-aware scheduling

Live forecasts across the scheduling tools, on tap from the timeline toolbar, with one-click rescheduling of work threatened by unsafe outdoor conditions. Concrete, mortar, resin and roofing all have working limits, and a record of the forecast is what justifies the decision to stop.

Work templates, applied from the schedule

Drop a saved work template onto a project straight from the Gantt rather than rebuilding the same sequence of jobs by hand for every similar project.

Full schedule change history

Every schedule change organised by project, down to an individual job's version history. When somebody asks why a start date moved, the answer is a record rather than a recollection.

Drag-and-drop scheduling

See your week or month at a glance. Drag team members and subcontractors onto jobs, move them when priorities change, and avoid double-booking. Simple enough that anyone in the office can use it.

Qualification checks on every assignment

When you assign someone, ScopeKit checks their qualifications against what the project requires and flags anything missing or expiring: CSCS, Gas Safe, Part P, CISRS, whatever the requirement. A worker missing a qualification the project marks as mandatory cannot clock in there, and a subcontractor whose insurance has expired or is missing cannot be booked without a recorded reason.

Multi-site visibility

Running 3 sites with 20 subcontractors? See who is on which site at a glance. When someone does not show up, find the nearest available qualified person and reassign.

Subcontractor scheduling

Schedule subcontractors alongside your own team. They see their assignments on their phone. No more WhatsApp messages at 6am asking where they should be today.

Quick reassignment

When someone calls in sick, find a replacement without ringing round. The assignment suggestions rank who is free on skills, distance to site and availability. Drag the replacement onto the job and they get notified immediately.

Notifications and reminders

Team members and subcontractors get notified of their schedule, changes, and reminders. No more missed starts or confusion about which site to go to.

Questions contractors usually ask

What buyers ask before signing up — answered straight.

01

What happens when someone calls in sick at 6am?

Open the schedule, check the suggestions ranked on skills, distance and availability, and drag the replacement onto the job. They get notified instantly. ScopeKit checks qualifications as you assign, so it tells you straight away if the replacement's CSCS, Gas Safe or Part P ticket is not valid for that work, before they are on site.

02

Does this only work for office-based scheduling, or does it cover field workers too?

Both. Office staff drag and drop on a Gantt or week view; field workers see their schedule on their phone via the field-worker app. GPS clock-in lets you compare actual location against scheduled location, so you know whose times are real before timesheets get approved.

03

How do the assignment suggestions actually pick people?

It is a weighted scoring rule, not AI. The schedule optimiser scores each available person for each job on skills, distance from home to site, availability, experience and cost against the job budget, and ranks them. As you schedule, ScopeKit flags clashes: double-booking, someone on leave or unavailable, over capacity, and a subcontractor whose insurance has expired or is missing. Suggestions are proposals; you make the final call.

04

Can we run multiple sites and still see everyone in one place?

Yes. The schedule has site, project, team, employee and customer filters that compose. A 5-site contractor with 30 subbies sees who is on which site at a glance, plus a workload view that highlights anyone over capacity that week.

05

Will it work for service rounds, not just project work?

Yes. Round planner is a separate view designed for maintenance contractors and service trades: auto-route-optimised diary, sortable stops on a map, “On my way” texts to customers with an arrival time. Project Gantt and round planner share the same workforce data.

Scheduling is included on every plan. See pricing for the seats and monthly estimates each plan includes.

Stop the 6am WhatsApp chaos

Schedule your teams and subcontractors on one board, with qualifications checked before anyone is assigned.

15-minute walkthrough. No credit card required.